How to Install Slat Wall Panels on Drywall
Screw through the felt into the studs wherever a stud lines up, and use drywall anchors for the fixings in between. Avoid glue on drywall unless the wall is staying that way for good.
Drywall is the most common wall behind a slat panel and the easiest to work with. Follow the instructions supplied with your panels where they differ from what is here.
What you need
- Stud finder, level, tape measure and pencil
- Drill or driver
- Black screws long enough to pass through the panel, which is about 0.8 inches thick, and bite at least an inch into a stud
- Drywall anchors rated for more than the load, for fixings that miss a stud
- Fine-tooth saw and a sharp utility knife
Find and mark the studs
Studs in US homes usually sit 16 inches apart, center to center, and sometimes 24. Find them with a stud finder and mark each one at the top and bottom of the wall, above and below where the panels will go, so the marks stay visible as you work.
A 23.6 inch panel will cross one stud, sometimes two. That is fine. You are not trying to hit a stud with every screw.
Fix the panels
- Set the first panel plumb with a level. Do not trust the corner.
- Screw through the felt in the gaps between slats. Put a row near the top, a row near the bottom, and rows in between, roughly every 16 to 24 inches up the panel.
- Use studs where they fall. Where a row of screws lines up with a stud, drive straight into it.
- Use anchors elsewhere. Mark through the felt, take the panel down, set the anchors, then put the panel back and screw into them.
- Stop when the head is flush. Driving it further crushes the felt and leaves a visible dimple.
- Butt the next panel up so the gap at the joint matches the gap between slats.
Screws, glue or both
| Screws | Adhesive | |
|---|---|---|
| Removable | Yes, with small holes to fill | No, it tears the drywall face |
| Skill needed | Low | Low, but no second chances |
| Holds while setting | Immediately | Needs bracing or a few screws |
Some installers use a few dabs of adhesive along with screws for a flatter result on a wavy wall. Know that even dabs will mark the wall when the panel is removed.
Check before you drill
- Wires and pipes. Cables usually run vertically above and below outlets and switches, and horizontally at outlet height. Use a detector, and keep screws short enough that they do not reach the far side of the wall cavity.
- Baseboard. Decide whether the panels sit on top of it or it comes off. Sitting on top is easier and hides the gap at the bottom.
- Outlets. See cutting around outlets and corners.
Want better sound?
Screwing straight to the wall gives the lower of the two results in the manufacturer test we cite. In that test, battens behind the panel roughly tripled absorption at speech pitch. See do slat panels work.
Quick answers
Do slat panels need to be screwed into studs?
Not every screw. A panel weighs about 25 to 30 pounds and is held by many fixings, so studs plus anchors in between is enough for a wall. Ceilings are different and need framing behind every fixing.
Will screws damage my drywall?
They leave small holes that fill with spackle when the panels come off. Construction adhesive does far more damage, because it pulls the paper face off the drywall.
Can I use slat panels in a rental?
Screws are the reversible option. Check your lease, and plan to fill and paint the holes when you leave.